General Wayne A. Downing

Peoria International Airport

Inspector: Cindy Boston Questions? Call (309)697-8272 x110

Field Conditions Report
05 Sep 2010 0927 CST

RWY CLSD PAVEMENT CONDITIONS
BOWMONK READINGS/MU
APCH MDPT RLOT
ISSUED
NOTAM TIME FSS PIA
CANCELLED
TIME FSS PIA
13/31     
     
     
     
       
     
4/22     
     
     
     
       
     
TWY CLSD PAVEMENT CONDITIONS
ISSUED
DATE NOTAM TIME FSS PIA
CANCELLED
TIME FSS PIA
E     
         
     
E1     
         
     
E2     
         
     
E3     
         
     
E4     
         
     
E5     
         
     
E6     
         
     
E7     
         
     
M     
         
     
A     
         
     
A1     
         
     
A2     
         
     
A3     
         
     
A4   TWY A4 CLSD E RWY 4/22  
05/15 05/020      
     
A5   CONST AREA N SIDE AND S SIDE LGTD/BARRICADED  
07/15 07/023      
     
A6     
         
     
D     
         
     
P     
         
     
T     
         
     
T1   EAST SIDE CONSTRUCTION LGTD BARRICADES  
06/20 06/050      
     
T2   WEST SIDE T2 CONSTRUCTION BARRICADE WITH OPEN CONSTRUCTION & PAEW 
06/30 06/073      
     
TERM
RAMP
  NNW SIDE CEMENT BARRICADES UNLGTD NW SIDE PAEW LGTD BARRICADE 
         
     
GA
RAMP
    
         
     
CARGO
RAMP
  W SIDE LGTD CONSTRUCTION BARRICADES  
08/04 08/009      
     

Active NOTAMs:


08/009 PIA RAMP CARGO RAMP W SIDE LGTD CONSTRUCTION BARRICADES 
07/023 PIA TWY A5 CONST AREA N SIDE AND S SIDE LGTD/BARRICADED 
06/073 PIA TWY WEST SIDE T2 CONSTRUCTION BARRICADE WITH OPEN CONSTRUCTION WEF 1006300213 
06/072 PIA TWY WEST SIDE T2 PAEW 
06/050 PIA TWY T1 EAST SIDE CONSTRUCTION LGTD BARRICADES 
05/020 PIA TWY A4 CLSD E RWY 4/22 
12/035 PIA RAMP TRML RAMP NNW SIDE CEMENT BARRICADES UNLGTD 
08/013 PIA RAMP TERMINAL RAMP BARRICADES W SIDE LGTD, OPEN CONSTRUCTION 
06/043 PIA RAMP TERMINAL RAMP NW SIDE PAEW LGTD BARRICADE